feat(manager): integrate forecast controls and merge V4 development
Tests / test (push) Failing after 49s
Tests / test (push) Failing after 49s
Merge the V4 development history with current manager, SDL and setpoint fixes. Retain guarded trial behavior and consolidate controls in Prognose / Forecast. Exclude the unverified accounting-evidence change; no runtime deployment or new dispatch permission. Validated: 357 PHPUnit tests / 1758 assertions, 150 PHP syntax checks, 310 backend tests, 16 portal tests and isolated UI/receiver checks. develop and beta publication explicitly approved by Daniel Haefliger.
This commit is contained in:
@@ -4,6 +4,13 @@ Alle wesentlichen Aenderungen an Enelix EMS werden in dieser Datei dokumentiert.
|
||||
|
||||
## Unreleased
|
||||
|
||||
- Manager: V4-Planempfang und Prognosebedienung im vorhandenen Bereich
|
||||
Prognose / Forecast zusammengefasst. Explizite Start-/Stoppaktionen pruefen
|
||||
Lizenz und bestehende Testfreigaben. Kein automatischer Start, keine neue
|
||||
Dauerbetriebsfreigabe und keine Loeschung bestehender Laufzeitobjekte.
|
||||
- Integration des bisherigen V4-Entwicklungsstands mit den aktuellen Manager-,
|
||||
SDL- und Sollwertkorrekturen; V4-Stopp und Sollwertverwerfen bleiben erhalten.
|
||||
- Optionaler nativer V4-Betriebsdatensender fuer den Schattenversuch (standardmaessig aus), separate Diagnose und sichere Batterie-/Messquellenzuordnung. Kein neuer Fahrplan wird lokal ausgefuehrt; vollstaendige Monatspeak-/Viertelstunden-Messnachweise und deren Historienadapter bleiben Voraussetzung.
|
||||
- Verbraucher: Beim Verwerfen einer Manager-Vorgabe wird auch die gespeicherte
|
||||
und sichtbare Sollleistung auf 0 W gesetzt. Gilt fuer Batterie, beide
|
||||
Ladestationen, Pufferspeicher, Verbraucher 1-Stufig, Waermepumpe und
|
||||
|
||||
Reference in New Issue
Block a user